-- Scotts Contracting - StLouis Renewable Energy: StLouis Arch Restoration

Search This Blog

Showing posts with label StLouis Arch Restoration. Show all posts
Showing posts with label StLouis Arch Restoration. Show all posts

10.01.2013

StLouis Gateway Arch Grounds SlideShow with Bid Request

Great Rivers GreenWay Project Slide Show



ADVERTISEMENT copied from:http://www.greatriversgreenway.org/projects/public-bids-rfqs.aspx
Central Riverfront, Leonor K. Sullivan Boulevard and Bikeway
Raising and Reconstruction of Leonor K. Sullivan Boulevard
Federal Project TDG-0705(333)

Notice to Contractors
Sealed bids for the raising and reconstruction of Leonor K. Sullivan Boulevard, will be received at the office of the The Great Rivers Greenway District, 6174A Delmar Boulevard, St. Louis, MO 63112 until 2:00 o'clock P.M. (Central Daylight
Time) on Thursday, October 24, 2013. Bids will be publicly opened and read at that time (2:00 o'clock P.M.). All bids to be submitted on the bid forms provided in the specification package.

The large scale project is a mile and a half in length on the St. Louis City riverfront and is centered in front of the Gateway Arch. The proposed work includes: a complete reconstruction of Leonor K. Sullivan (LKS) Boulevard with an adjacent bicycle
path, pedestrian guardrail, a pedestrian walk and streetscape improvements and amenities. ADA accessible pedestrian sidewalks will be constructed on both sides of the Leonor K. Sullivan Boulevard to provide new ADA accessible walksfrom
the Arch groundsto the Riverfront. Overall work to include, but not limited to,site demolition, rough and finish grading, extensive retaining wall construction, utility work, sewer construction, flood wall modifications, landscaping installation,
lighting installation, pavement marking, signing, traffic control, and sediment and erosion control.

Bidding registration must be completed prior to obtaining bid documents. Locations for obtaining bid documents will be provided after registration. All requests for bid documents should be addressed to Bill Chilton at David Mason & Associates at
(314)534-1030, bchilton@davidmason.com, or 800 S. Vandeventer Ave., St. Louis, MO 63110.

A pre-bid conference will be held at 10:00 AM on October 7, 2013, at 1520 Market Street, St. Louis, MO 63103. A DBE Mixer conducted by the Construction Manager, BSI, will be held immediately after the pre-bid meeting. All bidders are encouraged to attend both the pre-bid meeting and DBE Mixer with the Construction Manager.

All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher.

The Great Rivers Greenway District hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.

This project will be broken into 10 different packages, and a contract will be awarded to a prime contractor for each of the 10 packages. Many packages will require the contractors be on MoDOT’s Qualified Contractor List per Section 102.2 of
the Missouri Standard Specifications for Highway Construction, 2011 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening.

Contractors and sub-contractors who sign a contract to work on this project must conduct a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site
employees within sixty (60) days of beginning work on the construction project.
A cashier’s check or a bid bond in the amount of 5% of the total bid shall be submitted with each sealed bid.

The Great Rivers Greenway District reserves the right to reject any or all bids.
DBE goals exist for each of the 10 packages – goals range from 9% to 26%.
No 2nd tier subcontracting will be allowed on this project.







___________
Thank you for stopping by St Louis Renewable Energy. Feel free to comment in the section below or contact Scotts Contracting- St Louis Home Improvement Projects and Energy Reducing Needs Get Your Green Building Tips and Resources at St Louis Renewable Energy Green Blog

Connect with Scotts Contracting

FB FB Twitter LinkedIn Blog Blog Blog Blog Pinterest

Featured Post

Misc Tools, Truck, For Sale

$2,000 obo 97 Nissan Pickup 4wd AC 4cyl 5speed New Clutch / Pressure Plate, Plugs, Wires, Rotor, Dist Cap, Door Locks w/ Keys  Front Clip su...