Video Building a Curved Exterior Wall

Building a Curved Wall on a Budget


  1. Additional Support for the 2nd to 3rd Floor Staircase
  2. Exterior Storage Space

Goals:

  •  This is a Beautiful Older Home in the Central West End area of St Louis.  Any additions or modifications must be historically correct and blend in with the surroundings.  

Build Notes:

  • Who doesn't need more Storage Area?  By Enclosing the Area and Installing a Door a small area for storage was created!
  • When this home was Originally built in the Late 1800's there were No Support Posts under the Stair Case.  Prior to Building the Curved Wall for Additional Support the Client Installed the "Green Painted Support Post / Beam"  Since the Lumber was still use-able the Posts were re-positioned for the addition of the Curved Wall Metal Framing
  • Radius Arc- In this application: Use the Curve of the Existing Structure.
    • Metal Tracks have bendable tabs- Once track is in Position bend the tabs to hold the track in shape until the track is attached impermanently 
  • Exterior Drywall was screwed to the Metal Studs after 2" Vertical Relief Cuts were made in the Sheet Rock.
  • 30# Roofing Felt and Stucco Mesh
  • Stucco with Fiber Re-Inforcement




Completed Project Looks Original to the Structure while
Meeting Goals and Needs of Client!!!


Thank you for stopping by St Louis Renewable Energy. Feel free to comment in the section below or contact Scotts Contracting- St Louis Home Improvement Projects and Energy Reducing Needs Get Your Green Building Tips and Resources at St Louis Renewable Energy Green Blog

11.15.2010

Brady Metal Framing System- Photos, Diagrams, Green Building, Leed

Web Exclusive: Brady Metal Framing System Wins CFSEI Award

March 11, 2009



The CFSEI Cold Formed Steel Engineers Institute recently awarded Brady Innovations with an Innovative Design Award. Mr. Brady was recognized for the innovative use of cold formed sheet steel in the Century Tower Project, Century City, Calif.

Todd Brady, founder of Brady Innovations, has developed a superior metal stud framing system for interior and exterior door and window rough openings. Now being offered in the market for its third year, it is quickly becoming the industry standard.

The ProX Header replaces multiple piece (stud & track) built-up headers hand-made in the field.



Examples on how to Install Metal Headers for Doorways and Windows.



ProX Header offers superior strength, it is faster to install, provides a better quality finish and uses less steel to accomplish equal header spans so it is (LEED CREDITS) an environmentally friendly choice too.

The ProX Header meets the requirements of the International Building Code (IBC) 2006 and the California Building Code (CBC) 2007 including tough OSHPD California Hospital - Title 24 Standards.

A CASE STUDY

Cold-formed steel innovators Brady Innovations, LLC and Ficcadenti Waggoner & Castle, consulting structural engineers, submitted "ProX Header" for the award of innovative product design.

Specific use of Building: "Luxury Condominium Residences"

An elliptical masterpiece designed by world-renowned Robert A.M. Stern Architects ascends 42 stories into the skies of Century City. The Century boasts panoramic views stretching from downtown, to across the Santa Monica Mountains and the Pacific Ocean.

The Century is registered with the US Green Building Council with anticipated LEED Silver Certification, the benchmark for high-performance green building, which encompasses energy efficiency, sustainable building materials, water conservation and indoor environment quality.

Project Requirements and Solutions:
Several challenges faced the cold-formed metal stud components and the installers (metal stud framers) on this project. For this report we will focus on five key challenges:

1. WIND STUDY and COMPLIANCE
a. Project Requirements: Due to the buildings 42-story height and elliptical configuration a wind study was required and was performed by Cermak, Peterka and Petersen (CPP Inc.) Wind Engineering and Air Quality Consultants (PH: 970-221-3371). The results of the wind study required that the cold-formed metal stud framing components and assemblies withstand wind pressures up to 80 pounds per square foot. Keeping in mind the towers elliptical shape, it was especially difficult to [efficiently] design a jamb and header system at the door and window openings through out the tower.

b. The Solution: The tower framing was designed to withstand wind pressures up to 80 pounds per square foot at designated locations. Efficiencies were gained by tailoring the designs of the exterior framing system to match the various wind pressure requirements around the building. At the towers (double glass siding doors) terrace openings Tom Castle designed radius'ed ProX Headers. The ProX Headers innovative design not only solved design and engineering limitations it also solved constructability (installation) and finished quality problems.
c. For material saving due to innovative product design see item 5 (i)

2. THE BUILDING'S ELLIPTICAL SHAPE
a. Project Requirements: The building was designed with an elliptical shape. This shape makes a beautiful building. However, cold-formed metal stud framing components are manufactured in straight pieces.
b. The Solution: Every framing component that installs horizontally must be radius'ed to match the building's contour. The radius changes depending upon location in the egg shaped building. This includes all exterior top and bottom tracks and header components. The ProX Headers used on the building exterior were radius'ed to match the building contour at various locations. The ProX Header innovative design does not require assembly, contrary to traditional built-up box headers, after it is "stretch formed" which solves many constructability (installation) and finished quality problems.

3. HAND-SET STONE OVER SPANDREL FRAMING
a. Project Requirements: Exterior "Low Rise" Spandrel Framing at the first 3 levels. The first (3) three levels of the tower are clad in hand set stone over structural steel spandrel framing, vertical tube steel and cold-formed metal stud infill framing was designed to support the weight of this 4 inch thick stone as well as wind and seismic loading while maintaining a strict deflection criteria.

b. The Solution: ProX Header was used at the top and bottom of the spandrel framing to carry the in-fill metal stud framing from the structural steel tube support to steel tube support. This application of the ProX Header replaced two (5) five piece traditional box headers. The ten (10) pieces were replaced with two ProX pieces, which resulted in significant time and material savings.

c. For material saving due to innovative product design see item 5 (ii)

4. MORE THAN 4,000 DOOR and WINDOW OPENINGS
a. Project Requirements: Interior "Door and Window Framing." Being a luxury condominium tower means thousands door openings throughout the building floors. The best quality finish is a must at the building interiors. There are approximately 100 door and window openings on every floor. The original plans called for built-up (stud and track) headers and jambs, which not only require excessive materials and man-hours of labor, but also prevent a superior quality finish.

b. The Solution: Brady Innovations and Martin Brothers/Marcowall designed upgraded 2-inch wide flange single jamb studs and ProX Headers at each of these 4,000 openings. This rough opening design provides the best quality framing substrate for the drywall and finishing crews, which results in a superior finished product for the buildings owner. The ProX Headers innovative design also eliminates countless hours of cutting which results in a safer work environment. Less cuts means less risk.

c. For material saving due to innovative product design see item 5 (iii)

5. GREEN BUILDING EFFORTS –(LEEDS)
a. Project Requirements: The Century is registered with the US Green Building Council with anticipated LEED Silver Certification, the benchmark for high-performance green building.

b. The Solution: Installing ProX Header in several of the above applications the overall construction realized a substantial savings in material usage. LESS raw materials, LESS manufacturing energies, LESS Trucking, LESS material cutting and handling and Better Safety too.

i. At the Exterior Tower: ProX Header vs. Built-up stud & track headers—640 studs were eliminated from this project by using ProX Header.

ii. At the Exterior Low Rise: ProX Header (2 pieces.) replaced built-up (10 pieces) stud & track headers—1,440 studs were eliminated from this project by using ProX Header.

iii. At the Interior: ProX Header replaced built-up stud & track headers saving 2,000 studs—2-inch wide flange single jamb studs replaced double jamb studs saving an additional 8,000 studs = 10,000 studs were eliminated from this project by using ProX Header.

The ProX Header is Better by Design:
The ProX design has saved countless man-hours of time and solved many issues of constructability on this project alone. The ProX design offers Better Production, Better Safety, Better Quality and it's Better for the Environment too.


Sidebar: PROJECT DETAILS

The ProX Header was use extensively in both the interior and exterior of the Century Tower.

Project Name: "The Century"
Location: Century City, Los Angeles County, Calif.
Construction Schedule: April 2007 through August 2009
Project (Structural) Engineer: Magnusson Klemencic Associates, 1301 Fifth Ave. Suite 3200 Seattle, Wash. 98101-2699, (206) 292-1200
Project Architect: HKS Architects, Inc., 9441 West Olympic Blvd., Beverly Hills, Calif., 90212, (310) 788-7700
Project Owner: The Related Companies, 60 Columbus Circle, New York, N.Y. 10023, (212) 421-5333 and/or The Related Companies, 18201 Von Karman Ave., Suite 900, Irvine, Calif., 92612, (949) 660-7272
General Contractor: WebCor Builders, 550 South Hope Street, Los Angeles, Calif., 90071, (213) 239-2800
Consultants and their Roles: Ficcadenti Waggoner & Castle, Consulting Structural Engineers 3100 Oak Road, Suite 390 Walnut Creek, Calif., 94597, (925) 280-0098; Tom Castle S.E., Principal Design of Cold Formed Steel Components
Cold-Formed Metal Stud Framing Contractor: Martin Brothers/MarcoWall Inc., 17104 South Figueroa. St., Gardena, Calif., 90247, (310) 532-5335 Bryan Mac - Project Manager
Cold-Formed Steel Manufactures: Dietrich Metal Framing (under license from Brady) Brady Innovations LLC, 13969 Aubrey Road, Beverly Hills, Calif. 90210, (818) 288-1188 – Todd Brady, President


Sidebar: Specific Uses of Cold-Formed Steel in Construction


Figure 1
The specific use of cold-formed steel for the purpose of this application is focused on the innovative design and construction installation of the ProX Header as described above. Please see the attached photos as evidence of it production, safety and quality efficiencies. As you can see, the ProX design has these benefits designed right into it's innovative shape.

Figure 1: The Century Tower 18 of 42 Floors under Construction – Date: May 2008



Figure 2
Figure 2: ProX Header at exterior radius'ed spandrel. This application shows a ProX Sill (Header installed upside-down) and replaced a five-piece built-up assembly. The bottom of the spandrel frame also uses a ProX Header.



Figure 3
Figure 3: ProX Header At exterior terrace framing. These locations were also radius'ed at the egg shaped ends of the building. Most ProX Headers were scheduled as single 16 gauge pieces. However, at longer spans it is sometimes necessary to use the ProX Insert too.




Figure 4
Figure 4: ProX Header at the exterior side of the Towers Terrace walls shows how nice and flat the trims lay for a superior quality exterior plaster finish.



Figure 5
Figure 5: Aluminum reveals intergraded into the lath and plaster system install flush and flat with out shimming which is traditionally required due to framing material build-up at the header to jamb connection.



Figure 6
Figure 6: Exterior Radius'ed window rough openings at the low-rise portion of the project was completed with radius'ed ProX Headers and sills in-lieu-of built-up (stud and track) sections, which are nearly impossible to radius.



Figure 7
Figure 7: Interior rough openings were accomplished using 20-gauge by 2 inch wide flange single jamb studs and 20 gauge single piece ProX Headers. The ProX Clip is internal for a smooth flush drywall finish. At double doors a single piece 16-gauge ProX Member was used, the gauge was upgraded for the additional span.



Figure 8
Figure 8: The drywall installed over the cold-formed metal stud framing and behind the (HMF) Hollow Metal Frame to create a 1-hour fire rated wall assembly.



Figure 9
Figure 9: With traditional headers the thin rips of drywall in corners like these almost always fractures and causes excessive rework. The quality of this corner with the drywall installed over ProX Header is superior in many ways.


Visit the website at www.proxheader.com.


--
Scott's Contracting installs metal framing for your Eco Friendly and Sustainable Construction Projects for the St Louis Region.

10.24.2010

Green Product Supplier for Scotts Contracting

Information Provided by: Scotty,Scott's Contracting, St Louis "Renewable Energy" Missouri http://www.stlouisrenewableenergy.com
How To: Green Build A Curved Wall. - Job Site Photos with Build Notes - * Step by Step Instructions for How to Build a Curved Wall. * Project By Scotts Contracting, Custom Builder utilizing Green Building Techniques ...

This living room was stuck in the 1970s thanks to dusty whites and tired brown tones. The bulky brown-brick fireplace did little to enhance the space, as it was placed asymmetrically on a long stretch of wall. ... The much-needed makeover consisted of adding a curved ceiling to balance the room and improve acoustics and relocating the fireplace to be the focal point of the room. Custom-built cabinetry flanks the fireplace, keeping media equipment organized and out of ...
Curved Wall Metal Stud Framing Exterior Grade Sheet Rock Installation of Wire Mesh and Waterproofing First Coat Stucco Curved Wall Door & Trim Installation (Note: Curved Wall Installation Looks Original) Gangway View from Yard ...
However, they can draw water through foundation walls. If this starts to be a problem, turn off the dehumidifier. white basement, 2 purple chairs, ROI. Quick Return. Finishing a basement is a good investment. ...

Here is My contact at the Store: VinceVogelgesang@pasupplies.com

P and A Drywall

Proudly Serving Customers Since 1974

Construction Materials

Specializing in Drywall Products
DRYWALL

INSULATION

METAL STUD & TRACK
FIRETREATED LUMBER
KEMLITE “FRP”
FIBER-CEMENT SIDING
USG INTERIOR PLASTER
QUIET “ROCK”
PITTCON DESIGNER DRYWALL & REVEALS
FRY-REGLET ARCHITECTURAL METALS
FASTENERS
TOOLS & LADDERS & STRETCH BOARDS
JOINT TREATMENTS
CORNER TRIMS
ADHESIVES
CAULK
LOOKING FOR SOMETHING NOT ON THIS LIST, PLEASE ASK
3 LOCATIONS TO SERVE YOU
2600 Endicott Ave. St. Louis, MO 314-426-3785
1022 Wilmer Road Wentzville, MO 636-332-0680
345 Hwy 42 Osage Beach, MO 573-348-1545

5.09.2010

Start to Finish Job Photos for Curved Wall with Build Notes

Curved Wall Metal Stud Framing
Design Build-Green Project


Project for: Central West End Homeowner  
Project Notes 
1. Green Build 
2. Metal Framing 
3. Natural “Fiber Reinforced” Stucco Finish 
4. Additional Support for 3rd Floor Stair Case, and 
5. Additional Storage Area 
6. Recycled French Door and Crystal Door Knob Supplied free of charge by Scott's Contracting 
7. Completed Project Looks Original!
Materials in Place and ready to start the Build
Metal Stud Framing- Note how the Curved Top Plate Conforms to the Radius and Curve of the Existing Structure.  Creating a Perfect Fit and Matching the Existing Building!

Example of Using 2in Relief Cuts on Exterior Grade Drywall to Conform to the Natural Curve- Radius of the Metal Stud Framing. This is one way of making a flat surface curve!

Installation of Aluminum Wire Mesh and Water Proofing. The Final Step before Applying the Natural Fiber Reinforced Stucco Finish


First Coat of Stucco


Final View after Installation of a Recycled French Door and Crystal Door Knob that were recycled by Scotts Contracting.

View From Front Yard.  Note-Curved Wall Looks Original and Fits perfectly with the Aesthetics of the Central West End Home.  Mission Accomplished! 

Scott's Contracting GREEN BUILDER, St Louis "Renewable Energy" Missouri. https://stlouisrenewableenergy.blogspot.com, contact scottscontracting@gmail.com for additional information or to Schedule an Estimate for the Construction of Your Next Project.




Connect with Scotts Contracting

FB FB Twitter LinkedIn Blog Blog Blog Blog Pinterest

Featured Post

Misc Tools, Truck, For Sale

$2,000 obo 97 Nissan Pickup 4wd AC 4cyl 5speed New Clutch / Pressure Plate, Plugs, Wires, Rotor, Dist Cap, Door Locks w/ Keys  Front Clip su...