Part 10: Interior Wall Framing, Plumbing, Laundry Room Exhaust Vent and Plumbing-Benton Park Gut Rehab Green Blog Series
The below CAD drawing was the Basic Plan going into the Rehab Project.
In the Photo below we have 2nd Floor Laundry Room, 2nd Floor Hot and Cold Pex Water Lines for the Laundry Room,and the 1st and 2nd Floor Dryer Vent Exhaust. Quarters were a little cramped but everything was able to fit snugly into the allocated space.
Thank you for stopping by St Louis Renewable Energy. Feel free to comment in the section below or contact Scotty for any Home Improvement Projects or Energy Reducing Needs and Scotty, Scotts Contracting will respond ASAP. Company Web Address: http://www.stlouisrenewableenergy.com
The below CAD drawing was the Basic Plan going into the Rehab Project.
Benton CAD Floor Plan by Scotty,Scotts Contracting |
Neither the Building Owner or Myself like to have Return Air Ducts Located on the Floor (where they suck or pull in more Dirt and Debris). The HVAC Return Air Vents were instead installed 6 ft off the floor.
Installing New HVAC Ducts in the Wall |
This is a very Important Wall. It not only will support the Kitchen Cabinets. It contains the Plumbing Stack for the 2nd Floor Kitchen as well as the First Floor Kitchen Area. This wall was constructed using a double 2x4 wall with the studs running parallel with the wall plates. This allowed for Plenty of Clearance for the Plumbing on both the First and Second Floor.
Hint: See Next Blog Post about Why this Picture | is so Important |
The plumbing for this project was done by: Master Plumber St Louis and I highly recamend their Services for your plumbing needs.
Double 2x4 Plumbing Stack Wall |
The photo below is the only photo I have of the future Laundry Room. This was added the day the Master Plumber St Louis showed up at the Job Site. All though this was a change order (email the Pros at Master Plumber StL) they handled the addition of the Laundry Room for this floor and the 2nd Floor. Giving the Investment Property Apartments Updated Amenities- Which increases the both the Rental Value and the Investment Property Portfolio.
Above the 1st Floor Laundry Room Ceiling- |
Benton Gut Rehab Green Blog Series
Part 8: 1st Floor Weatherization
Part 9: See the Difference a Little White Paint Makes
Part 10: Interior Framing-Plumbing-Laundry Room
Part 11: Kitchen Framing Tip #36-Benton Rehab Project
Part 12: Water Main Repair- Benton Rehab
Part 13: Benton Rehab Project Drywall Installation and Tip: Number 1172
Part 14: Custom Flooring Patch Hardwood Floor Repair-Benton Rehab
Benton Gut Rehab Green Blog Series
Part 8: 1st Floor Weatherization
Part 9: See the Difference a Little White Paint Makes
Part 10: Interior Framing-Plumbing-Laundry Room
Part 11: Kitchen Framing Tip #36-Benton Rehab Project
Part 12: Water Main Repair- Benton Rehab
Part 13: Benton Rehab Project Drywall Installation and Tip: Number 1172
Part 14: Custom Flooring Patch Hardwood Floor Repair-Benton Rehab
Benton Gut Rehab Green Blog Series
Part 8: 1st Floor Weatherization
Part 9: See the Difference a Little White Paint Makes
Part 10: Interior Framing-Plumbing-Laundry Room
Part 11: Kitchen Framing Tip #36-Benton Rehab Project
Part 12: Water Main Repair- Benton Rehab
Part 13: Benton Rehab Project Drywall Installation and Tip: Number 1172
Part 14: Custom Flooring Patch Hardwood Floor Repair-Benton Rehab
Thank you for stopping by St Louis Renewable Energy. Feel free to comment in the section below or contact Scotty for any Home Improvement Projects or Energy Reducing Needs and Scotty, Scotts Contracting will respond ASAP. Company Web Address: http://www.stlouisrenewableenergy.com