Scotty, Scotts Contracting writes: Sustainable Buildings are the future of the Construction Industry and our future energy needs will be met from true Clean Energy Sources as well as creating Net Zero Energy Efficient Buildings for a sustainable future.

1st Floor Weatherization-Benton Project

St Louis, MO St Louis, MO 63103, USA
Reactions: 

3 Main Energy Efficiency Measures Taken on the Benton Project


  1. R22 Insulation installed in 2x6 Wall Framing Members
  1. Vapor and Air Filtration Barrier
  1. Additional HVAC Cold Air Return Duct


Scotts Contracting Installs R22 Insulation

R22 Batt Type Insulation-Friction Fit-
Johns Mansfield No Itch Insulation


Photo is the Water and Vapor Barrier used to seal the wall frame-Scotts Contracting,St Louis Renewable Energy
Water and Air Barrier
The Above Photo is the Water and Vapor Barrier used to seal the wall frame.  This material is recycled Billboard Sign Material.  The true R-Value of the Material is not known.  We do know that the material is Ten Times stronger and thicker than normal vapor barriers on the Market today. 

I added an additional HVAC 'Return' Air Duct to help
the Efficiency of the Electric Furnace


Scotts Contracting-St Louis Renewable Energy
before Modern Day Insulation they used Hair, Newspaper,
and other Miscellaneous Materials





Thank you for stopping by St Louis Renewable Energy. Feel free to comment in the section below or contact Scotty for any Home Improvement Projects or Energy Reducing Needs and Scotty, Scotts Contracting will respond ASAP. Company Web Address: http://www.stlouisrenewableenergy.com



Post a Comment

Job Site Project Photos via Google+

Loading...

St Louis Renewable Energy Sponsor Links

Scotts Contracting Online Business Card

Scotts Contracting Online Business Card
Direct Line: 299-Thirt Eight Fifty

Subscribe via email

Enter your email address:

Delivered by FeedBurner