Deck Failure FIXED Prevented Building Safety Issue

2x12 Ledger Support Masonry Brick Wall Attachment Photos, Notes, and Annotations.


2x12 Ledger Board was attached to the freshly Tuckpointed Masonry Wall with 2- one-half inch dia lag bolts and anchors at Sixteen Inches On Center (1/2" x 6" Lag Bolts). 
2x12 Ledger Board was attached to the freshly Tuckpointed Masonry Wall with 2- one-half inch lag bolts and anchors at Sixteen Inches On Center (1/2" x 6" Lag Bolts)
2x12 Ledger Board was attached to the freshly Tuckpointed Masonry Wall with 2- one-half inch lag bolts and anchors at Sixteen Inches On Center (1/2" x 6" Lag Bolts)




Next step is the installation of the Double Ledger that will support the Deck Joists in addition to a 3rd Deck Support Point.


________
The Deck to House Attachment Point or lack thereof seems to be somewhat of a common occurrence the photos below
Because the Deck was not built to current Building Codes the St Louis Building Code Department required.
  
Photo 1 and 2: Building Code Official- Required to add 1/2 inch diameter lag bolts every 16 inches







Thank You for stopping by the Green Blog. If additional information in needed or you have a question let me know by posting a question or comment. Together we can make a difference and create a future that will benefit everyone.

No comments:

Post a Comment

Post your Comments Below. Spam comments will not be published. webmasters do not store, sell, or spam your email address. Feel Free to You use HTML tags, KEEP IT GREEN, Dont Spam

Connect with Scotts Contracting

FB FB Twitter LinkedIn Blog Blog Blog Blog Pinterest