-- Scotts Contracting - StLouis Renewable Energy

Search This Blog

5.08.2012

Tell EPA to step in to ensure Keystone XL southern segment has thorough review

Tell EPA to step in to ensure Keystone XL southern segment has thorough review

Tell EPA Administrator Lisa Jackson: Prevent the rubber-stamping of the Keystone XL pipeline through Oklahoma and Texas.

EPA: Stop the rubber-stamping of Keystone XL
In less than 45 days, Canadian oil giant TransCanada could receive the rubber stamp it wants to build the southern leg of the Keystone XL tar sands oil pipeline from Oklahoma through Texas to the Gulf Coast -- unless we convince the Environmental Protection Agency to intervene.

News broke last week that, in addition to submitting its re-application to the State Department for the transboundary, northern half of its pipeline, TransCanada has also submitted its application for the only federal permit it needs to start building the southern half -- a water permit from the Army Corps of Engineers. The Army Corps of Engineers, which has an abysmal environmental track record, has a maximum of 45 days to approve or reject TransCanada’s application. Or, if they do nothing it will be approved by default.
The EPA regional office already objected to this fast-tracked approval process -- and pressure from you will help convince EPA headquarters to stop it.

Thank you for stopping by St Louis Renewable Energy. Feel free to comment in the section below or contact Scotty for any Home Improvement Projects or Energy Reducing Needs and Scotty, Scotts Contracting will respond ASAP. Company Web Address: http://www.stlouisrenewableenergy.com



Congress To Do List via Whitehouse.Gov


President Obama has put together a "to do" list for Congress that, if acted upon quickly, will create jobs and help restore middle class security.
These initiatives all have bipartisan support, and the President believes that they will help create an economy built to last that supports secure American jobs and makes things the rest of the world buys - not one built on outsourcing, loopholes, or risky financial deals. 
 
Twitter         <----    Find Me   --->         Facebook









5.02.2012

CADD Kitchen Design 2 Island Cook Top and Exhaust Hood

Scotts Contracting Latest Kitchen Design CAD Drawings

by clicking on the Photo you will be redirect to
Google Picasa Web Albums for Scotts Contracting










Thank you for stopping by St Louis Renewable Energy. Feel free to comment in the section below or contact Scotty for any Home Improvement Projects or Energy Reducing Needs and Scotty, Scotts Contracting will respond ASAP. Company Web Address: http://www.stlouisrenewableenergy.com


4.28.2012

Sewer Pipe Leak Detection

 

Kingshighway House Sewer Line Inspection Video

  • Found Sink Hole in Yard by Down Spout Sewer Line

  • Called Plumbing Companies for Repair EstimatesVerbal Repair Estimates started at $3,000.00Suggested to Video Scope Drain prices started at $125.00

  • Dug Inspection Trench to determine what was causing Sink Hole.
  1. I traced the Downspout Lateral Line down 8-10 ft and have not found the lateral line connection at the Main Line.
  2. I've feel I've dug enough and determined that we should do option 1 & 3 in the suggested fixes below.
  • Did Water Test to Determine if there was any stoppage in the Main Sewer Line. (I opened the Man Hole Directly behind the house and watched the water that was dumped into a house drain run into the City Sewer Line.)

  • Contacted Retired Plumber for Advice. Joe came by and gave these suggestions:
  • Suggested Fixes:
  1. Cap and Seal Down Spout Sewer Line since Water Test Determined Main Sewer Line was UN-obstructed. Redirect Down Spouts to drain into yard.

  2. Replace or Un-Clog Down Spout Line. Warning from Plumbers: “Do Not Interfere with Main Line or the Old Clay Pipes could become dislodged and start leaking. Creating a need for more digging and more pipe to need replaced.”
  3. Un-Clog all down spouts to eliminate future plumbing “lateral” line issues. All these clogs in Down Spouts are from the Trees out front and over the years the “helicopter seeds have stuck in the downspouts lateral lines.”

  • Scotty adds:
  • Add Gutter Screens to prevent future problems.
Notes:

I did not want to spend money on an Inspection (I would rather spend the same amount of money on a plumbing snake to clean out the remaining clogged Downspouts) and after talking with Joe I dug an inspection trench and determined: Original Problem was from helicopter seeds from trees out front of the house. I traced the line and found clogged areas but didn't find the lateral line / main line connection point (I've dug 8-10ft). I did a water test and determined main line was unobstructed. Since main line not clogged I suggest: seal the down spout line and redirect water into garden area along fence line by church. Problem solved. Add Gutter Screens or Downspout Screens to prevent future problems.

Upcoming Post will be on the Fix to the Sewer Line Problems.


From
See the Concrete Side Walk Repair You Tube Video


 Thank you for stopping by St Louis Renewable Energy. Feel free to comment in the section below or contact Scotty for any Home Improvement Projects or Energy Reducing Needs and Scotty, Scotts Contracting will respond ASAP. Company Web Address: http://www.stlouisrenewableenergy.com





Connect with Scotts Contracting

FB FB Twitter LinkedIn Blog Blog Blog Blog Pinterest

Featured Post

How Two Friends Turned Abandoned CASTLE into a 4☆HOTEL | by @chateaudut...

Join us on an extraordinary journey as two lifelong friends, Francis and Benoit, turn a crumbling, centuries-old castle into a stunning 4-st...