-- Scotts Contracting - StLouis Renewable Energy

Search This Blog

7.22.2016

Bill Gates’ Nuclear Pipe Dream convert Depleted U to Pu

If you're like me and read faster than watching a video here are the Transcripts for the interview.  It looks to me like complete madness and explains so much about the Inner Dealings of the Nuclear Industry and points directly to why all the nuclear waste has been left around in different places around the country where it is causing health issues around the St Louis Region and other places 

Paducah, Love Canal, Indian Point, Westlake Landfill, Coldwater Creek, Fukushima, Hartford...

  
Uranium to Plutonium is the grand scheme...

Published on Mar 15, 2016
(EnviroNews DC Bureau) — Editor’s Note: The following news piece represents the second in a 15-part mini-series titled, Nuclear Power in Our World Today, featuring nuclear authority, engineer and whistleblower Arnie Gundersen. The EnviroNews USA special encompasses a wide span of topics, ranging from Manhattan-era madness to the continuously-unfolding crisis on the ground at Fukushima Daiichi in eastern Japan.

READ/VIEW the full report and transcript on EnviroNews here: http://environews.tv/031416-paducah-b...


7.19.2016

Deck Failure FIXED Prevented Building Safety Issue

2x12 Ledger Support Masonry Brick Wall Attachment Photos, Notes, and Annotations.


2x12 Ledger Board was attached to the freshly Tuckpointed Masonry Wall with 2- one-half inch dia lag bolts and anchors at Sixteen Inches On Center (1/2" x 6" Lag Bolts). 
2x12 Ledger Board was attached to the freshly Tuckpointed Masonry Wall with 2- one-half inch lag bolts and anchors at Sixteen Inches On Center (1/2" x 6" Lag Bolts)
2x12 Ledger Board was attached to the freshly Tuckpointed Masonry Wall with 2- one-half inch lag bolts and anchors at Sixteen Inches On Center (1/2" x 6" Lag Bolts)




Next step is the installation of the Double Ledger that will support the Deck Joists in addition to a 3rd Deck Support Point.


________
The Deck to House Attachment Point or lack thereof seems to be somewhat of a common occurrence the photos below
Because the Deck was not built to current Building Codes the St Louis Building Code Department required.
  
Photo 1 and 2: Building Code Official- Required to add 1/2 inch diameter lag bolts every 16 inches







Thank You for stopping by the Green Blog. If additional information in needed or you have a question let me know by posting a question or comment. Together we can make a difference and create a future that will benefit everyone.

7.12.2016

Deck Failure Prevention Building Safety Issue


One of the reasons that decks collapse is the connection point at the wall, As seen in the following photo: Ledger Board is not attached to the brick wall.  

Currently: This area is supported by a cobbled up support post that rests on the Lower Stairway.  This is not to building codes and is a SAFETY Issue.

Photo Improper Deck Ledger Board House Attachment with Notes on Proper Repair
Building Safety Violation: Improper Deck Ledger Board House Attachment with Notes on Proper Repair

July 19, 2016 Update: Deck Failure FIXED Prevented Building Safety Issue


Thank You for stopping by the Green Blog. If additional information in needed or you have a question let me know by posting a question or comment. Together we can make a difference and create a future that will benefit everyone.

6.14.2016

Better Together: Fragmentation Holding St. Louis Region Back

Some interesting points mentioned in this article about St Louis.  One of the main things I took away was that when we are all working towards a goal makes goals easier accomplished.
ST. LOUIS (KMOX)-The group that’s been looking at the fragmentation of the St. Louis region, has issued a new report that concludes that the region’s political structure is holding it back.
 Better Together: Fragmentation Holding St. Louis Region Back: Group summarizes two years of research.

Connect with Scotts Contracting

FB FB Twitter LinkedIn Blog Blog Blog Blog Pinterest