-- Scotts Contracting - StLouis Renewable Energy: Saving a Deck From the Landfill Part 3-

Search This Blog

3.05.2012

Saving a Deck From the Landfill Part 3-




Day 4 Photos of the Structural Deck Repair- 
Installing the Handrails
Rebuilding the Lower Staircase
Simpson Strong Tie Connectors


 "Bring the Deck to Current Building Codes or Tear It Down


Part 4- Saving a Deck from the Landfill will post soon ( Power Washing and Paint Next Steps)


Day 4



  • Upper Staircase
  • Hand Rail
  • Bracing
  • Clean Up
Upper Staircase Completed

  • Simpson Strong Tie Connector for Post Beam Location
Simpson Strong Tie Connector Post Beam Location


  • Simpson Strong Tie Connector for Staircase Stringers
Strong Tie Stair Stringer Support Straps 20 ga


  • Lower Staircase
  • Hand Rails
  • Bracing
Completed Lower Staircase 



  1. All Structural Issues Passed Inspection Mar 5, 2012
  2. Power Washing and Paint Next Steps







Thank you for stopping by St Louis Renewable Energy. Feel free to comment in the section below or contact Scotty for any Home Improvement Projects or Energy Reducing Needs and Scotty, Scotts Contracting will respond ASAP. Company Web Address: http://www.stlouisrenewableenergy.com

No comments:

Post a Comment

Post your Comments Below. Spam comments will not be published. webmasters do not store, sell, or spam your email address. Feel Free to You use HTML tags, KEEP IT GREEN, Dont Spam

Connect with Scotts Contracting

FB FB Twitter LinkedIn Blog Blog Blog Blog Pinterest