-- Scotts Contracting - StLouis Renewable Energy

Search This Blog

4.10.2017

StLouis White TPO Roof Project CAD Detail

CAD Detail No: 9821 White TPO Flat Roof Replacement Detail using Structodeck.

Eco Friendly White TPO Roof Job Site Project Photos bottom of page


CAD Detail White Roof Install Masonry Building StLouis Investment Property
CAD Detail No: 9821 White TPO Flat Roof Replacement Detail using Structodeck
  • I've found that making a simple and quick graphic image to use as a visual tool to explain a building system repair to a client is easier when I provide a "non technical" image of the proposed work to be done.
  • Why GAF EverGuard® TPO
    • Outperforms standard TPO in heat aging and UV tests—the best predictors of TPO performance
      - Independent TPO Study proves EverGuard® TPO 60 mil Membrane is the best standard TPO in accelerated aging. View the key findings and full study here.
      - After accelerated heat aging at 275°F (135°C) for 112 days, EverGuard® TPO showed no cracking—while every one of the competitors’ samples had failed!
      - UV testing—Greater than 2.5 times the industry standard (ASTM D6878 weather resistance test)
    • Guarantees are available up to 25 years when using EverGuard® TPO 60 mil Membrane.*
    • Easier to install due to:
      - Large welding window
      - Most complete line of accessories
      - 10' (3.05 m) wide sheets








  • DESCRIPTION STRUCTODEK HD is not only an integral roofing system component; it also makes roofing easier with physical properties that generate structural rigidity and dimensional stability. The wood fiberboard composition of STRUCTODEK HD possesses natural bonding qualities, resulting in superior adhesion capabilities. Adhesive tightly grasps the fibers of STRUCTODEK HD without causing excess absorption, providing a solid and secure roof system which bonds very well with many asphalt, coal tar, and cold-process adhesive products. The lightweight nature of STRUCTODEK HD is better than heavier alternatives and will keep the roof load below the specified maximum weight. Source





  • Below Porch photo prior jobsite building photo - barrel tile roof removal replaced with asphalt shingles.


    Kevin at Travis Roofing Supply was a great help in outlining the proper materials and needed prep to ensure the TPO roofing will meet and exceed the expectations of the Investment Property Owner plus the 25 year product guarranty. 

    Below are the project photos for the TPO white roof Project




















    Travis Roofing Supply is located just north of the Vandeventer/44 in the old RSG Roofing Building 







    Thank You for stopping by the Green Blog. If additional information in needed or you have a question let me know by posting a question or comment. Together we can make a difference and create a future that will benefit everyone.

    12.14.2016

    MOhemp Kenya: Carbon Credit Sales Support Philanthropy

    MOhemp Kenya: Carbon Credit Sales Support Philanthropy: For those who are wondering how a startup agriculture business of MOhemp Kenya can afford to spend  $2,249,002  dollars on the Philanthropy... For those who are wondering how a startup agriculture business of MOhemp Kenya can afford to spend $2,249,002 dollars on the Philanthropy activities that do not affect the bottom line of the company. I am proud to announce that Carbon Credit Sales are used to support the philanthropic activities! What a great use for those whom are needing to offset the carbon they produce! MOhemp Kenya will put the dollars to work in helping the local community. MOhemp Kenya total Carbon Credits are estimated at $4,498,004.. The Carbon Credits generated will be split 50/50 with the future Investor who helps to fund the Agriculture Startup! Carbon Credits Support Philanthropic Activities-Community Outreach, Education, Research MOhemp Kenya Philanthropic Activities supported by Carbon Credit Sales In addition to the Carbon Credit Bonus for the Lender or whomever helps assist MOhemp Kenya receiving the funding needed, we have built in a: Goodwill Payment of $59,858 a year for four years! MOhemp Kenya is thinking long term income potential and the Founders will sacrifice a portion of their future salaries to help get the ball rolling on the Agriculture Startup. Investor Information Packet is ready for viewing. Investor packet contains details on repayment of the $2M investment in 4 years- total cash repayment of $3,098,000 that when combined with the $2,249,002 Carbon Creditstotals: $5,347,002. Not a bad ROI on the original $2M business startup costs.

    12.02.2016

    Home Fire Repair and Remodel

    The following photos are images from the job site, highlighting areas that the prior weatherization crews missed -when they were insulating this building.  

    The missing insulation in critical areas causes greater energy needs - adding to the carbon footprint of this home.

    The missing insulation in critical areas causes greater energy needs - adding to the carbon footprint of this home.

    The Hemp Insulation Solutions to Thermal Bridging
    Industrial Hemp Insulation stops thermal bridging!
    Industrial Hemp Insulation stops thermal bridging!


    Fire repair, gut rehab- property was one of the most insulated buildings I've worked on in StLouis (that wasn't mine). The prior so called "energy experts" who installed all the insulation, missed insulting the spots most needed.
    In this home's lower floor is where a garage and storage rooms are located. There are two giant heat traps one of which extends thru the home to the roof area- the chimney & The other heat sink is the metal post and beam system that supports the second floor;floor.
    Heat and cold transfer thru denser materials faster and more efficiently that a porous substance.
    All the second floor boards are supported by this heat sink. This allows the heat and cold a way into the building thru conduction- thermal conductivity.
    The homes chimney is also located in the coldest part of the home and thermally conducts all the absorbed heat & cold into the second floor.
    To stop the thermal conductivity- building owner should insulate both of these areas and stop the heat or cold from ever reaching the heat sinks. By wrapping the chimney & metal it will never get cold or hot eliminating thermal conductivity.





    Thank You for stopping by the Green Blog. If additional information in needed or you have a question let me know by posting a question or comment. Together we can make a difference and create a future that will benefit everyone.

    11.28.2016

    Under Stair Movable Storage Unit Plans

    Open Source Design Build Drawings- Under Stair Movable Storage Unit Plan


    I was asked to design and build customstorage units for underneath a set of basementstairs.  

    Here are the Design Build Drawings in the following slide show presentation.  Give it a minute to load, the controls are in the lower left, if you have questions, comments, or complaint use the contact form and someone will address your concern.



    Design Build Drawings-

    Under Stair Movable Storage

    Under Stair Movable Storage Plan

      Design Issues Solved by enabling the 3 storage units to move independently.  

      Allowing the Movable Storage Units to be completely removed from the space- gives all the needed room for future cleaning and inspections.

      The added benefit of having movable storage units in a basement type setting- where water is known to cause damage to things left directly on the floor.  With the Movable Storage Units- the size and height of the caster wheels chosen will determine the bottom shelf height distance off the floor- 2 inches or greater.

      This provides Safety to your items in Storage for low water basement flooding issues.

      DIY Suggestions
      • Be careful in choosing the height of the Caster Wheels.  
      • Too tall of wheels will cause a "Tip Hazard" of Movable Storage Unit.
      • Width of wheel is determine by floor covering- example carpet wide wheel, concrete narrow wheel.
      • Always store heavier items on lowest shelf.
      Grand Total of: 120,960 cu in  (4,480 cu ft) Minimum Storage Space created with the Movable Storage Units 


      Small:     20,160 cu in
      Medium: 40,320 cu in
      Large:     60,480 cu in


      This is like having the storage capabilities of a second kitchen.
      Page 1 Design Build Under Stair Movable Storage Plan
      Page 1 Design Build Under Stair Movable Storage Plan

      Page 2 Design Build Under Stair Movable Storage Plan
      Page 2 Design Build Under Stair Movable Storage Plan

      Page 3 Design Build Under Stair Movable Storage Plan
      Page 3 Design Build Under Stair Movable Storage Plan

      Page 4 Design Build Under Stair Movable Storage Plan
      Page 4 Design Build Under Stair Movable Storage Plan

      Page 5 Design Build Under Stair Movable Storage Plan
      Page 5 Design Build Under Stair Movable Storage Plan


      Page 6 Design Build Under Stair Movable Storage Plan
      Page 6 Design Build Under Stair Movable Storage Plan

      FREE SHARE - OPEN SOURCE - 

      Use as needed ~ modify to fit

      your stairway.

      Stay Tuned for
      material Price Lists and
      actual Build Notes.

      Questions or Comments fill in the contact form
      or leave me a message below.
      Full Size Under Stair Movable Storage Unit Plans

      Thank You for stopping by the Green Blog. If additional information in needed or you have a question let me know by posting a question or comment. Together we can make a difference and create a future that will benefit everyone.

      Connect with Scotts Contracting

      FB FB Twitter LinkedIn Blog Blog Blog Blog Pinterest

      Featured Post

      1 Hack To Eliminate Your A/C Power Bill This Summer!