Because the Deck was not built to current Building Codes the St Louis Building Code Department required-
"Bring the Deck to Current Building Codes or Tear it Down"
Structural Site Inspection and Documentation of Needed Repairs of the Deck by an Architectural Engineer,
Obtain a Repair Permit (based on the Engineers findings) for the needed repairs,
Structurally reinforce the existing deck to the Suggestions made by the Architectural Engineer,
Repair other areas that are in disrepair
Have the added “Structural Work” Inspected by the St Louis Building Code Official
Power Wash and Paint
Final Inspection by the St Louis Building Code Official and Property Owner
-
- Add ½ in by 8in Lag Bolts at 16in OC at Joist House Connection to existing 3/8 in Lag Bolts
|
 |
Add ½ in by 8in Lag Bolts at 16in OC at Joist House Connection to existing 3/8 in Lag Bolts, Scotts Contracting, St Louis Renewable Energy |
|
- Additional Photo of Added Lag Bolts to Joist Wall Connection
|
 |
Additional Photo of Added Lag Bolts to Joist Wall Connection |
|
- Lag Bolts at 16in OC the Entire Length of the Joist
|
 |
Lag Bolts at 16in OC the Entire Length of the Joist |
|
- Temporary Support for Safety and to make sure the Deck Stays True and Plumb while we added the Double 2x8 Main Support Beam
- Note: I don't really think the Deck would have collapsed onto the crew while working on the Main Support but for Peace of Mind I went ahead and installed a Temporary 2x4 Post and Beam.
|
 |
Temporary Support for Safety |
|
- Note: Simpson Strong Tie Connector- Post Beam Connection on 2 Center Posts
- Outer Post utilize 2- 1/2 x 8in Bolt, Nut, Washer
|
 |
Simpson Strong Tie Connector- Post Beam Connection on 2 Center Posts |
|
-
- Upper Stairs and New Deck Boards
- 3- 2x12 Stair Stringers
- 7 3/4in Risers
- 10 in Tread
|
 |
Upper Stairs and New Deck Boards |
|
- Upper Stairs
- New Deck Boards
- New Upper Railing
|
 |
Upper Stairs,New Deck Boards,New Upper Railing |
|
- Removing Lower Stair Case
|
 |
Removing Lower Stair Case |
|
- Adding 2x8 to Existing Double 2x8 Joist- 3 Total 2x8- Combination of 16 Galvanized Nails, Screws, Glued, and 2-1/2 x 8in Bolt, Nut, Washer
|
 |
Adding 2x8 to Existing Double 2x8 Joist- 3 Total 2x8- Combination of 16 Galvanized Nails, Screws, Glued, and 2-1/2 x 8in Bolt, Nut, Washer |
|